World’s longest tunnel will speed Alpine trains

Switzerland is getting ready for a fancy-dress opening of its newest engineering marvel. The Gotthard Base Tunnel, drilled through 35 miles of solid rock, is the longest and deepest railway tunnel ever constructed, and its opening will draw visits from the French President, the Chancellor of Germany and the Prime Minister of Italy.

All those countries will benefit by speedier times for cargo and passengers through the Alps; the double-track tunnel, under construction for 17 years, goes through the base of the mountain range, saving the long hauls up to the entrances of the current tunnel. It cost $12 billion, and was finished on time and on budget.

Trains, running at up to 155 mph, will start using the tunnel in December after tests. It will sharply reduce times; Zurich to Milan will go from over 4 hours to 2-1/2. 

Share the Post:

Featured Destination

Comments

0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments

Gumbo's Pic of the Day

The View North

I was visiting a friend, and this was the view from their house. I could understand why they built their house facing this direction. I was taken by the beauty!

Read More

Posts by the Same Author