Burning train, car crashes, 100 actors: The Bridge holds a drill
TV-like chaos as the Oresund Bridge held a large-scale emergency drill to test response times and equipment.
TV-like chaos as the Oresund Bridge held a large-scale emergency drill to test response times and equipment.
After 16 years in service, the bridge between Sweden and Denmark is ready for new paint…and it will take 15 years to do it.
Sweden’s plan for mandatory ID checks at borders, designed to reduce the flow of refugees seeking asylum, is about to have an unintended consequence: reducing
TV-like chaos as the Oresund Bridge held a large-scale emergency drill to test response times and equipment.
After 16 years in service, the bridge between Sweden and Denmark is ready for new paint…and it will take 15 years to do it.
Sweden’s plan for mandatory ID checks at borders, designed to reduce the flow of refugees seeking asylum, is about to